N-S 1074.64-1071.50; E-W 125.50-122.70
Session 2-3 Final Report, June 27, 2014
This is the final report of the second and third sessions during the 2014 excavations in the church nave in Unit 2 of the ... 835, B62, p. 111-112; burial ... (reconstructed L 1.98 m, actual W 0.94 ... 2010). An overturned column