The following is a summary of excavations in three areas in North of Nezi: the courtyard of a Byzantine house, the room north of the courtyard, a room south west of the courtyard and a suite of rooms south ... 1961 season in Agora SW-G by ... pedestalling of wall 57-G and the ... of sections F and G |
This excavation was undertaken from May 30-August 13, 2016 in the area of the planned new apotheke of the ASCSA’s Corinth Excavations. As the excavation permit requires, the primary objective was to reach ... by four walls: Wall 49 ... Plan). The dates of Walls 49 ... Wall 49, and may be |
Kyle Mahoney and Rachel McCleery
Nezi Field Excavations Final Report
1015.20 to 1005.80 N, 264.30 to 277 E
May 28-June 15, 2012
This is the final report on the third session of excavation (May 28-June ... in the red layer. As G ... undercutting earlier walls. G ... 2012-49) dates to 1270 +/- 10 |
Session III
Temple E Southeast
2-27 June 2014
This is the final summary of the third and final session of excavations for the 2014 season in the north area of Unit 2 in the Frankish quarter, Temple E ... rooms F and G of Unit 2 from ... excavations of Rooms F and G at ... E123.49, W122.52]) of the South |
An Jiang, Catharine Judson
2016 Corinth Session I
South Stoa Excavation, Shop 1 Rear
Coordinates: N: 1092.3, S: 1084.7, E: 355.9, W: 349.6
Excavation Dates: April 5-21, 2016
Introduction
This is ... associated finds (e.g. obsidian ... contexts (e.g. Context 411) also ... (e.g. relationship with |
Katherine Harrington, Jana Mokrišová
Team Blue, Session 1
Nezi Field Excavations
N: 1017.20 N, S: 1006.90 N, E: 263.50 E, W: 255.50 E
1-25 April, 2013
This is the final summary of the first session of ... area (N-S 1012.49 ... (e.g. amphorae), as well as |
Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016
Alexandra Daly and Thalia Parr
DATES OF EXCAVATION: May 4-20 2016
COORDINATES: N: N 1090.40; E: E 353.95; S: N 1084.70; W: E 349.60 ... 80.68-80.49 and the clayey surface ... Eutresis (J. L. Caskey and E. G |
Sarah Lima
Session 3
End of Season Report
15 June, 2009
Between the dates of May 25, 2009 and June 15, 2009 (Session III), our excavation team comprised of Sarah Lima (recorder), Panos Kakouros (pickman), ... 6572, 84.49 MASL, and surface ... possibility of contamination (e.g |
|
|