|
Introduction:
This is the final report for the first session of excavations in the 2015 season for Rooms 4 and 6 of Unit II in the area of Temple E SE. Room 4 was last excavated by A. Rohn in July and ... A. Rohn in July and August ... 0.45 m. The depth is unknown ... m), though presenting a |
Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016
Alexandra Daly and Thalia Parr
DATES OF EXCAVATION: May 4-20 2016
COORDINATES: N: N 1090.40; E: E 353.95; S: N 1084.70; W: E 349.60 ... in a 1.00 x 0.50 m area) ... in a 2.60 x 0.35 m area) ... preserved in a 1.20 x 0.55 m |
N-S 1074.64-1071.50; E-W 125.50-122.70
Session 2-3 Final Report, June 27, 2014
This is the final report of the second and third sessions during the 2014 excavations in the church nave in Unit 2 of the ... measures 0.38 x 0.20 m. A number ... height of 1.7 m. Dental health ... tibia, while Deposit 64 – a |
Katherine Harrington, Jana Mokrišová
Team Blue, Session 1
Nezi Field Excavations
N: 1017.20 N, S: 1006.90 N, E: 263.50 E, W: 255.50 E
1-25 April, 2013
This is the final summary of the first session of ... 1016.46-1014.59, E-W 259.47-258.59), a ... hearth, with a schist and tile ... contained a single illegible coin |
EXCAVATION SUMMARY
Six weeks ago, on April 10, 2007, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an excavation area at the extreme north of the Nezi field under the supervision of Guy Sanders, ... minimum diameter of 0.90 m. ... 0.5 m.
At the bottom of ... Forum. We worked with a crew |
Session III
Unit 2, Room 9
N: 1086.73, S: 1079.10, E: 132.85, W: 126.83
Unit 2, Room 6
N: 1085.00, S: 1077.00, E: 120.70, W: 116.85
This is the final summary of the third excavation session for 2015 in ...
The construction of the cistern began with a large, deep cavity (approximately 2.50m
maximum diameter), which cut through the plaster floor to a depth of about 4.31m ...
830. Wall 700/166 retains two structure numbers because it was mistakenly given a new |
|
|