[Corinth Basket] NB958 B15 P34

Basket/zembil 958 15 34 Cleaning Basket of Dumped Fill [no elevations taken]; ... 2003/04/29 ... 15 ... Cleaning Basket of Dumped Fill [no elevations taken];

[Corinth Basket] NB165 P111

Deposit 165 111 WC 16-17- a 13-15. 90 above toichobate to toichobate level of 7-9. C.-P 14-15 -V15-16. From 0.22 above, 0.50 below toichobates. Ep. 14. D. No12-No15. 0. 60-0.30 above toichobates above ... 1937/03/01 ... Ep. 14. D. No12-No15. 0 ... WC 16-17- a 13-15. 90 ... 14-15 -V15-16. From 0.22

[Corinth Basket] NB156 P111

Deposit 156 111 N-O:12-15 0.30 m. above toichobate to level oftoichobate below red strosis ... 1937/03/01 ... N-O:12-15 0.30 m. above toichobate to level oftoichobate below red strosis

[Corinth Basket] NB161 P15

Deposit 161 15 NB161 P015 Possibly with C-1936-855: north of Shops XXIII,XXIV +2.20 to 1.50 m. (no. not in NB) ... 1936/10/29 ... NB161 P15

[Corinth Basket] NB84 B174 P112

Basket/zembil 84 174 112 Pit in house M VI M VI 1.05-1.15 A large no. of sherds including many painted. LM I characteristic. Note fragments of 3 or more Cretan cups. Note ivy leaf sherd. [NB 85, p ... LH I ... -1.15

[Corinth Basket] NB279

Deposit 279 Lot 2066 NB279 Lot 2031 Lot 2051 NB279 LOT 2049 NB279 Lot 2048 NB279 Lot 2070 NB279 Lot 2087 Lot 2056 NB279 Lot 2056 Lot 2087 NB279 Lot 2019 MT Surface layer Building N:28, room 3, surface ... AT least 2nd half 4th c. A.C., one 6th c. lamp ... General fill east of Building N-O:25-26, from 0.15 m. below top of wall 13 to -0.40 ... LT: General fill east of Bldg. N-O:25-26 ... MT. North Corridor, south of wall 13 -0.15 to -0.30 m.

[Corinth Basket] NB84 B31 P26

Basket/zembil 84 31 26 House O, section F We have begun to cut down section (F). Here in east part of section there seems to be a floor level at a depth of ca 0.15. No such floor in west part. The pottery ... LH III ... -0.15

[Corinth Basket] Nezi Field, context 299: E-W wall at E Baulk

Cut 1101 299 0 Structure materials: Limestone, Sandstone, Conglomerate. Material size: 0.40L, 0.35W, 0.15H. Material finish: roughly hewn. Material construction: random coursed. Material bonding: mud ... npd ... 0.35W, 0.15H. Material finish: ... Str 299 runs into the E Baulk and has no foundation visible initially.