[Corinth Report] Temple E, Southeast 2014 by Margaret Burr and Dylan Rogers (2014-05-05 to 2014-06-29): Room 7 and Corridor Between the Church and Unit 2

This is the summary of the second session of excavation in 2014 in Unit 2, Room 7, and the adjacent passage north of the church nave, in the area of Temple E Southeast (TESE). Room 7 was previously excavated ... Room 7 and Corridor Between the Church and Unit 2

[Corinth Report] Temple E, Southeast 2014 by Bram ten Berge and Katerina Ragkou (2014-05-05 to 2014-05-26): Roads and Courtyard of NW Passage, Session 2

Bram ten Berge, Katerina Ragkou Session II Temple E Southeast Excavations (TESE) N: 1071.69 S: 1058.97 E: 103.11 W: 94.50 May 5, 2014 – May 26, 2014 Introduction This is the final summary of the ... Roads and Courtyard of NW Passage, Session 2

[Corinth Report] Temple E, Southeast 2014 by Larkin Kennedy and Jody Cundy (2014-05-06 to 2014-06-27): Sessions 2-3 of 2014: Church Nave, Unit 2 of the Frankish Quarter

N-S 1074.64-1071.50; E-W 125.50-122.70 Session 2-3 Final Report, June 27, 2014 This is the final report of the second and third sessions during the 2014 excavations in the church nave in Unit 2 of the ... Sessions 2-3 of 2014: Church Nave, Unit 2 of the Frankish Quarter

[Corinth Report] Nezi Field 2007 by Lydia Herring, Josh Langseth, Kris Lorenzo (2007-04-09 to 2007-05-18): Frankish to Modern Strata in the Southern End of Nezi Field

EXCAVATION SUMMARY Six weeks ago, on April 10, 2007, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an excavation area at the extreme north of the Nezi field under the supervision of Guy Sanders, ... deposit (B40), and has a ... and Agora SW section J (NB ... 117, B131, B137 (the fill of a

[Corinth Report] Nezi Field 2007 by Lydia Herring, Josh Langseth, Kris Lorenzo (2007-04-09 to 2007-04-27): Pre-Early Modern to Modern Strata in the Southern End of Nezi Field

INTRODUCTION In the past three weeks, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an area at the extreme north of the Nezi field under the supervision of Director of Excavation Guy Sanders ... and 237) and section J (NB ... and preserved to a maximum ... installation, or 3) a floor(s). This