|
| 2017.19.0002 | Foundry pit after winter. | 15 Jun 2017 | | | | 2017.19.0004 | After cleaning north end of foundry pit. | 16 Jun 2017 | | | | 2017.19.0010 | Area west of House E floor during preparation for excavation. | 22 Jun 2017 | | | | 2017.19.0013 | Area west of House E floor after cleaning, with possible drain. | 22 Jun 2017 | | | | 2017.19.0014 | After cleaning deepest area of foundry pit. | 22 Jun 2017 | | | | 2017.19.0015 | After cleaning collapse of Wall A from foundry pit. | 22 Jun 2017 | | | | 2017.19.0017 | South end of foundry pit before cleaning. | 22 Jun 2017 | | | | 2017.19.0018 | House E, Room 1, revealing lower floor. | 23 Jun 2017 | | |
|