|
| Homer A. Thompson ... Three main ancient features were excavated within Section ΜΜ: the North Stoa, the South Building and the ancient East-West Street passing between the two buildings. After the destruction of the buildings, ... 10 Feb-25 May 1936 |
| John McK. Camp II ... Excavations in 2003 were carried out largely in the northwest corner of the Agora known as Section BZ. The area was divided into two parts: the north-south road and areas to the west, and east of the road ... 13 Jun-25 Jul 2003 ... Byzantine houses of the 10 |
INTRODUCTION
In the past three weeks, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an area at the extreme north of the Nezi field under the supervision of Director of Excavation Guy Sanders ... Nezi Field, context 25 ... Nezi Field, context 10 |
Room 8 [N: 1088.00 N, S: 1077.00 N, E: 129.00 E, W: 121.00 E]
Room 7 [N: 1086.30 N, S: 1078.20 N, E: 123.90 E, W: 119.40 E]
Rodríguez-Álvarez, Emilio
Session III
Introduction:
This is the final report ... between 23rd and 25th of April ... (1081.10-1079.20N, 128.55-127.50E) and 830 (1084.10-1081.10N, 128.30-126.70E) at the |
Introduction:
This is the final report for the first session of excavations in the 2015 season for Rooms 4 and 6 of Unit II in the area of Temple E SE. Room 4 was last excavated by A. Rohn in July and ... (1069.70-1070.70N; 114.35-116.10E) and 1997-13C (1069.25-1069.90N; 114.65-116.25E), as well as the tile |
Katie Rask, Marty Wells
ASCSA Corinth Excavations
End of Season Report
Blue Team
North of Nezi
The following is a summary of the excavations carried out in the area north of Nezi field during the 2009 ... 1030.25); and a series of roads ... session, 25 May -12 June. This ... context dated to the 10 |
This is the final report for the area excavated by the green team in Temple East – Southeast during the first session of excavation of 2014. Guy Sanders (director) and Jody Cundy (field director) supervised ... Temple E, Southeast, context 10 |
Corinth Northeast of Theater Trench 16C Report
Director of Excavations: Christopher Pfaff
Assistant Director: Ioulia Tzonou
Trench Supervisors: Kaia Brose and David Picker-Kille
Area Excavated: Northeast ... 9-20 May, 2022.
25 May 2022 ... 61.054-60.870 m (Deposit 10), as well as Wall 28 (Structure 25 |
|
|