|
During the second and third sessions of the 2008 season at Corinth, a contingent of Team Green excavated to the W of a 1960s-excavated courtyard within the greater area of North of Nezi. The area of excavation ... capacity.
I. Lotting registry ... Ottoman building to the W. The ... within the area to the W. |
Katie Rask, Marty Wells
ASCSA Corinth Excavations
End of Season Report
Blue Team
North of Nezi
The following is a summary of the excavations carried out in the area north of Nezi field during the 2009 ... bounded by walls 5631 and W ... W55, both east of the ... room between walls W55 on |
Stephanie Kimmey and Jennifer LaFleur
Session 1
TESE Excavations, NW Passage
N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E
April 7-May 3, 2014
This is the final summary of excavation ... Final Summary, Session I (NW Passage) |
Kate Larson and Jon Meyer
ASCSA Corinth Excavations
Blue Team Session 3 Final Report
N :1016.50 N, E: 263.00 E, S: 1005.70 N, W: 255.50 E
May 27 – June 18, 2013
During Session 3 2013, the Blue Team excavated ... preservation according to G. ... S. 1005.70 N, W. 255.50 ... 259.80 E, S. 1014.25 N, W. |
Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016
Alexandra Daly and Thalia Parr
DATES OF EXCAVATION: May 4-20 2016
COORDINATES: N: N 1090.40; E: E 353.95; S: N 1084.70; W: E 349.60 ... I. Because of its 4th ... Eutresis (J. L. Caskey and E. G. ... 1084.70; W: E 349.60 |
Alison Fields and Jessica Lamont
Team White, Session 3
Nezi Field Excavations Interim Report
Area 1: N-S 1016.05-1011.70, E-W 274.18-278.91
Area 2: N-S 1009.51-1005.94, E-W 278.90-271.47
May 27-June 14 ... ceramics (as per G. Sanders, ... N-S 1016.05-1011.70, E-W ... 1009.51-1005.94, E-W 278.90-271.47
May |
Room 8 [N: 1088.00 N, S: 1077.00 N, E: 129.00 E, W: 121.00 E]
Room 7 [N: 1086.30 N, S: 1078.20 N, E: 123.90 E, W: 119.40 E]
Rodríguez-Álvarez, Emilio
Session III
Introduction:
This is the final report ... E. 130.80; W. 127.50) ... 1077.00 N, E: 129.00 E, W ... E, W: 119.40 E] |
Luke Madson and Jesse James, Session III 2022 (May 30 - June 24)
Excavation Summary:
This excavation took place from May 30 to June 17, 2022, during the third excavation session of the season. It continued ... James, Session III 2022 (May ... the W), a road whose width ... by 0.8m E-W (visible |
|
|