|
Basket/zembil 84 18 12 Trench N Trench N. There is a good wall in this trench extending N-S for a long distance cf (52)-(53) (55) (56) (57)-(58) in sketch on p. 10. It looks to me as if this may ... 1916/06/05 ...
[sketch plan of trench and ... (57)-(58) in sketch on p. 10. It |
Deposit 114 134 Terracotta Factory, deposit 8, at edge of Trench XXII South of Terracotta Factory, Deposit at Edge of Trench XXII. (1931 plan, NB 114: 120-121), Deposit 8 Flanged cover {sketch included} ... 5th c ... South of Terracotta Factory, Deposit at Edge of Trench XXII. (1931 plan, NB ... Flanged cover {sketch ... 2 incised rings {sketch |
Deposit 114 21 NB114 P021 Lot XXXX-0034 Terracotta Factory, deposit 3: from north of north wall of court Northwest room, square 1K (1930 plan, NB 108: 128-129) 1K. Deposit of Figurine moulds. {in pencil: ... ca. 350-325, (Stillwell 1948, Corinth 15.1, p. 37, p. 105) ... Northwest room, square 1K (1930 plan, NB 108: 128-129) ... impressionistic hair. {sketch included} ... {sketch included}
KH 28 |
114 33 Court, near door to cooridor, square 2Q (1930 Plan: p. 128-129) Court, Square 4P (1930 plan, NB 108: 128-129), 20-30 cm. below wall, Deposit 4 Terracotta Factory, deposit 4: from court, halfway ... ca. 350-325 B.C. (Stillwell and Benson 1984, Corinth 15.3, p. 211) ... Court, near door to cooridor, square 2Q (1930 Plan: p. 128-129) ... Court, Square 4P (1930 plan, NB 108: 128-129), 20-30 cm. below wall, Deposit 4 ... Cooridor, square 0R (1930 plan: NB 108, p. 128-129), 10 cm below wall |
Deposit 114 45 NB114 P045 Terracotta Factory, from inside room with bases (court), 1P, 0.10 m. below wall Court, square 4R (1930 plan, NB 108: 128-129), 30 cm below top of wall Court, square 1P (1930 plan, ... 4th c. B.C ... Court, square 4R (1930 plan, NB 108: 128-129), 30 cm below top of wall ... Court, square 1P (1930 plan, NB 108: 128-129), 10 cm below top of walls ... near rim. Type IV? {sketch |
Deposit 114 32 Deposit 4, 20-30 cm below wall, Square 4P (1930 plan, NB 108: 128-129) 4P. Deposit of moulds
n. KP-218 {in pen: KP 2477 (apparently) JLB} Small shallow bowl at level of south wall.
KP ... ca. 350-325 B.C. (Stillwell and Benson 1984, Corinth 15.3, p. 211) ... Deposit 4, 20-30 cm below wall, Square 4P (1930 plan, NB 108: 128-129) ... {sketch included}
KH 66 {64 ... mould of female head. {sketch |
114 77 South of Terracotta Factory, West side of Trench XX, squares 8-9T (1930 plan, NB 108: 128-129), 20-30 cm. below wall, probably Deposit 8 KT 7-23 Seated kore
KT 13-17 ... 2nd half of 5th c. or later (Stillwell and Benson 1948, Corinth 15.3, p. 212) ... South of Terracotta Factory, West side of Trench XX, squares 8-9T (1930 plan, NB ... {sketch included}; 1 holding ... {sketch included: in margin: KT |
Basket/zembil 83 61 21 Room N of M, NE section We next took the NE sect. to a depth of 17 cm. A little coarse stuff was found.
We then went 12 cm deeper. This time we came upon some good pieces. ... LH IIIB (date of Myc. flower form) ... sect. in the plan, pg. 20 ...
[sketch of design]
Tzonou-Herbst=Sketch of FM 18B, Mycenaean |
Basket/zembil 84 23 18 Trench SS, SW extension 14 laborers and a sousta at Korako.
I have 2 on trench SS S.west extension.
...
In trench SS SW extension cf. plan p. 19 we seem finally to have found a ... 1916/06/06 ... extension cf. plan p. 19 we seem ...
[sketch of walls with small |
114 49 Altar Room, square 2T (1930 plan, NB 108: 128-129), 30 cm below wall Altar Room, between stelai and w. wall, 35 cm. below wall. South Room, square 5S (1930 plan, NB 108: 128-129), 25 cm below south ... 1930/06/13 ... Altar Room, square 2T (1930 plan, NB 108: 128-129), 30 cm below wall ... South Room, square 5S (1930 plan, NB 108: 128-129), 25 cm below south wall of ... {sketch included} |
114 74 Court, square 8P (1930 plan, NB 108: 128-129) Trench 20, near surface From Trench XX. Near surface.
Miniature squat oinochoe.
KT 1-67 {in red: 2-63} Lower part of ... 1930/06/18 ... Court, square 8P (1930 plan, NB 108: 128-129) ... flutes. {sketch included} |
Basket/zembil 83 1 1 South/connecting wall [House M: connecting wall LE and west wall, 0-35 (NB 83 B 1), cf. Plan pp. 2-3]
Began work with 4 men. Began by digging a trench eastward from the center partition ... 1916/05/29 ... (NB 83 B 1), cf. Plan pp ... whorl
[sketch of profile and ...
Outline of metal pin
[sketch of |
Cut 1104 10109 0 This wall is being removed as part of a plan to apply to have some walls removed in ths part of the site in order to reveal the 11th century AD phase of a house for public display. This ... 2009/02/16 ... This wall is being removed as part of a plan to ... appears on a sketch in NB 229 |
Basket/zembil 83 108 35 House B I B House
[sketch of House B]
We dug out the little house formed by four walls within the space between the south wall, east wall and second connecting wall. See plan ... LH I-II ... B House
[sketch of ... wall. See plan p. 2.
This house is very small (see plan |
114 48 Cooridor, square 1S (1930 plan, NB 108: 128-129), 25 cm below wall Altar room, square 2T (1930 plan, NB 108:128-129), 30 cm below wall X miniature plate
KT 6-37 lower part of small, ... 1930/06/13 ... Cooridor, square 1S (1930 plan, NB 108: 128-129), 25 cm below wall ... Altar room, square 2T (1930 plan, NB 108:128-129), 30 cm below wall ... female figure {sketch |
Cut 1104 10108 0 Structure materials: Squared limestone blocks, cobbles, roof tiles. Material size: Ave.=0.23 x 0.26 x 0.29m on upper course; larger b. Material finish: Some blocks squared (fair-face out), ... 2009/02/16 ... part of a plan to apply to ... but is sketched in NB 229, ... Travlos' plan, this wall extends |
Basket/zembil 84 73 56 House K, southern part K Aleko is clearing a floor level in south part of (K) just S. of stone pavement cleared up yesterday.
[Nakassis: the stone pavement referred to was exposed ... 1916/06/23 ... plan anywhere. To the north ... sketch on page 51. But to the |
Cut 1104 10100 0 Structure materials: Reused squared limestone blocks, unfinished cobbles.. Material size: Excavation needed to expose further.. Material finish: Some resued squared blocks, other unfinished ... 2009/02/12 ... of a plan to remove some ... number but is sketched on pg. |
Basket/zembil 81 1 201 Trench I, A I Trench I
On SE side of the hill in a place where there are two {banks} one above the other we are digging a transverse trench from S.E. to N.W. ca. 1.00 m wide. We ... mixed, mostly EH, some MH and LH with 1 West Slope Ware ... sections of 2 - 2 ½ m.
[plan of ... [sketch of sherd=deep bowl with ... note for the sherd sketch |
Cut 1104 10107 0 Structure materials: Limestone blocks (2 blocks total), roof tile. Material size: Max. block=0.55m x 0.47 x 0.14. Material finish: One block is squared the other unworked. Material construction: ... 2009/02/16 ... part of a plan to apply to ... sketch in NB 229 on page 157. |
|
|