| Eugene Vanderpool ... During the 1939 campaign in Section Ψ, several wells were dug that had been discovered but left unfinished or undug in 1938: Great Hole and Early Well at 33/Z (N 18:8); Tiled Roman Well at 18/H (N 17:1); ... 11 Apr 1939 ... Early Well at 33/Z (N 18:8); Tiled Roman Well at 18/H (N 17:1); Tiled Roman Well at |
| John McK. Camp II ... Excavations were carried out in three sections in the summer of 2005: BZ, BH and Γ.
In section BZ, mostly Roman levels were excavated, dating from the 1st to the 5th centuries A.D. Much more of the north-south ... 13 Jun-5 Aug 2005 ... excavated, dating from the 1st to |
| John McK. Camp II ... All the work during the season 2004 was concentrated on the northwest corner of the Agora north of the Panathenaic Way.
In BZ North, the last remains of Byzantine fills and walls were removed and Hellenistic, ... 7 Jun-16 Jul 2004 ... I/20,J/10-1/18,2/13 ... J/8,20-1/7,2/9 |
This is the final report for the area excavated by the green team in Temple East – Southeast during the first session of excavation of 2014. Guy Sanders (director) and Jody Cundy (field director) supervised ... Temple E, Southeast, context 18 |
Luke Madson and Jesse James, Session III 2022 (May 30 - June 24)
Excavation Summary:
This excavation took place from May 30 to June 17, 2022, during the third excavation session of the season. It continued ... the 1st century CE).
Early ... preliminarily to the 1st century BCE: ... layer. 1.74m of the drain’s |
Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016
Alexandra Daly and Thalia Parr
DATES OF EXCAVATION: May 4-20 2016
COORDINATES: N: N 1090.40; E: E 353.95; S: N 1084.70; W: E 349.60 ... Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016 |
Kelly E. O’Connor and Catherine A. Uritis
Corinth 2022 Session II (5/9/22- 5/27/22)
27 May 2022
Northeast of Theater, Trench 19B, Session II Final Report
Elevations of Identified Road Levels in 19B South ... upon further examination
1 ... paved road (1) running ... 1,05m from the east scarp and |
INTRODUCTION
In the past three weeks, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an area at the extreme north of the Nezi field under the supervision of Director of Excavation Guy Sanders ... Nezi Field, context 18 ... Nezi Field, context 1 |
|
|