For three weeks, I, Heidi Broome-Raines, worked in the area designated “North of Nezi,” conducting cleaning operations and new excavation. The baskets for which I am responsible are B 5001-5082 ... directed by Dr. G.D.R. Sanders ... 279.25 E) has been dated based |
Kate Larson and Jon Meyer
ASCSA Corinth Excavations
Blue Team Session 3 Final Report
N :1016.50 N, E: 263.00 E, S: 1005.70 N, W: 255.50 E
May 27 – June 18, 2013
During Session 3 2013, the Blue Team excavated ... 259.80 E, S. 1014.25 N, W ... It was supported by a 0.25 ... preservation according to G |
Alison Fields and Jessica Lamont
Team White, Session 3
Nezi Field Excavations Interim Report
Area 1: N-S 1016.05-1011.70, E-W 274.18-278.91
Area 2: N-S 1009.51-1005.94, E-W 278.90-271.47
May 27-June 14 ... (e.g., Nezi Field 2013 Session ... (H 85.25m) is relative to ... ceramics (as per G. Sanders, |
Katherine Harrington, Jana Mokrišová
Team Blue, Session 1
Nezi Field Excavations
N: 1017.20 N, S: 1006.90 N, E: 263.50 E, W: 255.50 E
1-25 April, 2013
This is the final summary of the first session of ... 255.50 E
1-25 April, 2013 ... (e.g. amphorae), as well as |
INTRODUCTION
For three weeks Ioannis Sapountzis worked in the area designated “North of Nezi,” conducting cleaning operations and new excavation. The area where cleaning and excavation took place is located ... G. D. R. Sanders the ... 273.25-E 274.20, N 1019.15-N |
Bram ten Berge, Katerina Ragkou
Session II
Temple E Southeast Excavations (TESE)
N: 1071.69 S: 1058.97 E: 103.11 W: 94.50
May 5, 2014 – May 26, 2014
Introduction
This is the final summary of the ... E-W: 99.51-99.25). The wall ... 83G; B. 81, NB 839, p. 139). |
Stephanie Kimmey and Jennifer LaFleur
Session 1
TESE Excavations, NW Passage
N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E
April 7-May 3, 2014
This is the final summary of excavation ... and ended on April 25 ... 83G; B. 81, NB 839, p. 139); |
|
|