Wesley Bennett and Lucas Stephens
Session II
Temple E Southeast Excavations
Corridor North of Church: 1075-1078.5 N, 121.5-129.5 E
Room 6: 1077-1085 N, 116.85-120.7 E
04-22.05.2015
This is the summary ... 2, Rooms 8 and 9 (Wall ... 13th of May by Wesley ... Session 2. Before the 2014 |
Bram ten Berge, Katerina Ragkou
Session II
Temple E Southeast Excavations (TESE)
N: 1071.69 S: 1058.97 E: 103.11 W: 94.50
May 5, 2014 – May 26, 2014
Introduction
This is the final summary of the ... Unit 1, Rooms 8 and 9.
For ... roads west of Unit 2 and on ... 1 and 2, in an area |
Dreya Mihaloew, Katie Rask, Marty Wells
ASCSA Corinth Excavations
North of Nezi
Session 2: April 27 – May 22, 2009
Session 2 excavations were carried out from April 27th to May 15th in the area north ... of Nezi
Session 2: April ... 2 excavations were ... that the late-13th century |
INTRODUCTION
In the past three weeks, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an area at the extreme north of the Nezi field under the supervision of Director of Excavation Guy Sanders ... hearth, 2) a potting ... was excavated with B2 ... the tree pits (B6/B9 |
FINAL REPORT: EXCAVATIONS OF SOUTH STOA, SHOP 2 REAR, SESSION 1 2016
Alexandra Daly and Thalia Parr
Dates of Excavation: April 5 – April 22
Coordinates: N: 1090.40 N, S: 1085.50 N, E: 351.40 E, W: 345.20 ... EXCAVATIONS OF SOUTH STOA, SHOP 2 REAR |
Sarah Rous, Rebecca Worsham
Session I
Temple E Southeast Excavations
N: 1087 N, S: 1075.25 N, E: 129 E, W: 116.5 E
6–25 April 2014
Introduction
This is the final summary of the first session of excavation ... dates to the late 13th to ... late 13th–early 14th ... late 13th to early 14th |
Kelly E. O’Connor and Catherine A. Uritis
Corinth 2022 Session II (5/9/22- 5/27/22)
27 May 2022
Northeast of Theater, Trench 19B, Session II Final Report
Elevations of Identified Road Levels in 19B South ... Session II (5/9/22- 5/27/22)
27 ... (Potential paved road) 58.95
2 ... (Disturbed by gulley) 61.02
9 |
We, Joseph Lillywhite, Joel Rygorsky, Matthew Sears and Martin Wells, continued excavation in the entirety of Nezi Field from May 5 – June 13th, 2008. This report will summarize our own findings, while ... 2008-06-13) |
|
|