This is the final report for the area excavated by the green team in Temple East – Southeast during the first session of excavation of 2014. Guy Sanders (director) and Jody Cundy (field director) supervised ... complete unit. The general ... represented some general fill on ... tumble of rocks within the |
Introduction
We, Stella Diakou and Jody Cundy, from April 27 to May 15, continued excavation in the west area of the Nezi field. The corners of our excavation area are as follows: NW corner: 1015N, 255.5E, ... together with the general ... contained tumbled blocks from the |
Stephanie Kimmey and Jennifer LaFleur
Session 1
TESE Excavations, NW Passage
N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E
April 7-May 3, 2014
This is the final summary of excavation ... to make generalizations ... had tumbled due to its lack |
N-S 1074.64-1071.50; E-W 125.50-122.70
Session 2-3 Final Report, June 27, 2014
This is the final report of the second and third sessions during the 2014 excavations in the church nave in Unit 2 of the ... elements tumbled off the pile to ... generation (Tzortzopoulou-Gregory |
|
|