[Corinth Report] Temple E, Southeast 2014 by Sarah Rous, Rebecca Worsham (2014-04-06 to 2014-04-25): Unit II, Room 6 and Room 8, Session I

Sarah Rous, Rebecca Worsham Session I Temple E Southeast Excavations N: 1087 N, S: 1075.25 N, E: 129 E, W: 116.5 E 6–25 April 2014 Introduction This is the final summary of the first session of excavation ... sealed by Floor 6 (NB 864 B62) ... mid-13th c. by pottery. A lead ... probably an undecorated lead

[Corinth Report] Temple E, Southeast 2015 by Danielle Smotherman and Tim Brannelly (2015-05-04 to 2015-05-22): 2015 Session II, Frankish activity in Unit 2, Room 9

Danielle Smotherman Timothy Brannelly Temple E, Southeast Excavations Session II Unit 2, Room 9 N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E 4-22 May 2015 2015 Session II, Frankish activity in Unit ... 652), a lead mending strip ... 712 (MF-2015-20), a lead seal was recovered in the

[Corinth Report] Temple E, Southeast 2015 by Emilio Rodriguez-Alvarez (2015-06-02 to 2015-06-26): Corinth Report: Temple E Southeast excavations. Unit 2, Rooms 8 and 7.

Room 8 [N: 1088.00 N, S: 1077.00 N, E: 129.00 E, W: 121.00 E] Room 7 [N: 1086.30 N, S: 1078.20 N, E: 123.90 E, W: 119.40 E] Rodríguez-Álvarez, Emilio Session III Introduction: This is the final report ... this garbage context. A lead seal (MF-2015-56) was

[Corinth Report] Temple E, Southeast 2014 by Stephanie Kimmey and Jennifer LaFleur (2014-04-07 to 2014-04-28): Final Summary, Session I (NW Passage)

Stephanie Kimmey and Jennifer LaFleur Session 1 TESE Excavations, NW Passage N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E April 7-May 3, 2014 This is the final summary of excavation ... lamp (MF 2014-10); a lead ... forming a seal for the deposit ... This leads to several

[Corinth Report] Nezi Field 2013 by Kyle Jazwa; Hilary Lehmann (2013-04-29 to 2013-05-17): Sesssion 2, Nezi Field, Final Report

Nezi 2013 Season Session 2 Final Report Kyle Jazwa; Hilary Lehmann N 1011.50-1017.49; E 259.60-269.70 23 May 2013 This is the final report for the second session of excavation at Nezi, 2013. Guy Sanders ... and a lead “star” with a ... possible floor level that seals ... effectively sealing off these

[Corinth Report] Nezi Field 2013 by Mohammed Bhatti and Daniel P. Diffendale (2013-05-09 to 2013-05-10): 2013 Session 1, Team Pink, Final Summary

Mohammed Bhatti and Daniel P. Diffendale Team Pink, Session 1 Nezi Field Excavations Final Report N 1006 – 1018.00; E 261.01 – 271.28 1–25 April 2013 This is a final summary of the first season of excavation ... (pottery), and this sealed over ... lead pipes? The line of cut