Bram ten Berge, Katerina Ragkou
Session II
Temple E Southeast Excavations (TESE)
N: 1071.69 S: 1058.97 E: 103.11 W: 94.50
May 5, 2014 – May 26, 2014
Introduction
This is the final summary of the ... 310 (N-S: 1063.88-1060.79 ... 0.20-0.35 (l.) x 0.20-0.30 (h.)), ... 0.10 (l.) x 0.10 (h.), and |
Stephanie Kimmey and Jennifer LaFleur
Session 1
TESE Excavations, NW Passage
N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E
April 7-May 3, 2014
This is the final summary of excavation ... 0.69 x 0.31 x 0.15m ... measured 1.13 x 0.40 x 0.19m ... top: 0.79; Diam. of bottom: |
EXCAVATION SUMMARY
Six weeks ago, on April 10, 2007, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an excavation area at the extreme north of the Nezi field under the supervision of Guy Sanders, ... Nezi Field, context 79 |
An Jiang, Catharine Judson
2016 Corinth Session I
South Stoa Excavation, Shop 1 Rear
Coordinates: N: 1092.3, S: 1084.7, E: 355.9, W: 349.6
Excavation Dates: April 5-21, 2016
Introduction
This is ... Loomweight Type X (context 411) ... IX-X (context 367) ... coin
2016-79 (context 383) |
Session III
Unit 2, Room 9
N: 1086.73, S: 1079.10, E: 132.85, W: 126.83
Unit 2, Room 6
N: 1085.00, S: 1077.00, E: 120.70, W: 116.85
This is the final summary of the third excavation session for 2015 in ...
The cistern terminates in packed dirt and some pieces of mortar. A drain (0.30 x ...
had only 0.79 ...
deposits in our sector, a small pit (808, 1.00 x |
Nezi 2013 Season
Session 3 Final Report
Grace Erny and Emily Joy
N 1005.89 – 1022.92; E 255.66 – 271.22
27 May – 21 June 2013
This is the final report for the third session of excavation at Nezi, 2013 ... 0.90 m, top surface 0.50 m x ... 1009.25-1010.04, E 255.71-257.79 |
This excavation was undertaken from May 30-August 13, 2016 in the area of the planned new apotheke of the ASCSA’s Corinth Excavations. As the excavation permit requires, the primary objective was to reach ... and NA #79), bronze buckles ... which was 2.15 m x 1.7 m x ... 268, a pit measuring 1.01 x |
|
|