EXCAVATION SUMMARY
Six weeks ago, on April 10, 2007, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an excavation area at the extreme north of the Nezi field under the supervision of Guy Sanders, ... B48, B60, B63, B66, B69, ... zone. The first, B2=B24 ... recent plow zone (B2 = B24 |
Katherine Harrington, Jana Mokrišová
Team Blue, Session 1
Nezi Field Excavations
N: 1017.20 N, S: 1006.90 N, E: 263.50 E, W: 255.50 E
1-25 April, 2013
This is the final summary of the first session of ... 1011.38-1010.62, E-W 258.24-255.68), and ... N-S 1013.60-1011.79, E-W ... 1015.80-1013.35, E-W 255.60-257.91), yet |
The following is a summary of excavations in three areas in North of Nezi: the courtyard of a Byzantine house, the room north of the courtyard, a room south west of the courtyard and a suite of rooms south ... 159-60, 170, 176, 180, 193-4, ... 5883 and 5882) from 1030.68 ... 1032.95 N and 265.68 to 267.01 |
Danielle Smotherman
Timothy Brannelly
Temple E, Southeast Excavations
Session II
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
4-22 May 2015
2015 Session II, Frankish activity in Unit ... 130.68), the North wall (Wall ... W. 130.68) and its ... 0.20 m., N. 1083.60; S. |
Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016
Alexandra Daly and Thalia Parr
DATES OF EXCAVATION: May 4-20 2016
COORDINATES: N: N 1090.40; E: E 353.95; S: N 1084.70; W: E 349.60 ... 1084.70; W: E 349.60 ... E 351.30, S: N 1086.60 ... corner, E 349.60, N 1090.80; SW |
Bram ten Berge, Katerina Ragkou
Session II
Temple E Southeast Excavations (TESE)
N: 1071.69 S: 1058.97 E: 103.11 W: 94.50
May 5, 2014 – May 26, 2014
Introduction
This is the final summary of the ... 1069.31-1068.32; E-W: 95.62-94.60) that ... 290, 294) is 85.24 ... (deposit 60) gives a post quem |
EXCAVATION SUMMARY
We, Josh Gieske and Laurie Kilker, from April 11 to April 23 2008 excavated in the courtyard of the Byzantine house uncovered by the 1961 excavations in Agora SW-G, overseen by Steven ... Nezi Field 2008 by Josh Gieske, Laurie Kilker (2008-04-07 to 2008-04-24) |
Luke Madson and Jesse James, Session III 2022 (May 30 - June 24)
Excavation Summary:
This excavation took place from May 30 to June 17, 2022, during the third excavation session of the season. It continued ... 30 - June 24)
Excavation ... Context 68 and Trench 16B, ... width varies from .60 to .66 |
|
|