[Corinth Report] Roads and Courtyard of NW Passage, Session 2

Bram ten Berge, Katerina Ragkou Session II Temple E Southeast Excavations (TESE) N: 1071.69 S: 1058.97 E: 103.11 W: 94.50 May 5, 2014 – May 26, 2014 Introduction This is the final summary of the ...

[Corinth Report] Final Report - Green

This is the final report for the area excavated by the green team in Temple East – Southeast during the first session of excavation of 2014. Guy Sanders (director) and Jody Cundy (field director) supervised ...

[Corinth Report] Sessions 2-3 of 2014: Church Nave, Unit 2 of the Frankish Quarter

N-S 1074.64-1071.50; E-W 125.50-122.70 Session 2-3 Final Report, June 27, 2014 This is the final report of the second and third sessions during the 2014 excavations in the church nave in Unit 2 of the ...

[Corinth Report] Final Summary, Session I (Unit 2, Church Nave)

Maggie Beeler, Morgan Condell Session 1 Temple E, Southeast Excavations N-S 1074.64-1071.50; E-W 126.00-122.70 April 2014 This is the final summary of the first session of excavation in 2014 in the Temple ...

[Corinth Report] Room 7 and Corridor Between the Church and Unit 2

This is the summary of the second session of excavation in 2014 in Unit 2, Room 7, and the adjacent passage north of the church nave, in the area of Temple E Southeast (TESE). Room 7 was previously excavated ...

[Corinth Report] Room F/5 and South Hall in Unit 2, Session 3

Session III Temple E Southeast 2-27 June 2014 This is the final summary of the third and final session of excavations for the 2014 season in the north area of Unit 2 in the Frankish quarter, Temple E ...

[Corinth Report] Unit II, Room 6 and Room 8, Session I

Sarah Rous, Rebecca Worsham Session I Temple E Southeast Excavations N: 1087 N, S: 1075.25 N, E: 129 E, W: 116.5 E 6–25 April 2014 Introduction This is the final summary of the first session of excavation ...

[Corinth Report] Final Summary, Session I (NW Passage)

Stephanie Kimmey and Jennifer LaFleur Session 1 TESE Excavations, NW Passage N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E April 7-May 3, 2014 This is the final summary of excavation ...