Icon, Name, Title, Date, Chronology
1997.07.0439 (80-79) The erection of the cross as usual tradition in building operations in Greece, marks the start of the roofing. 15 Mar 1956 1997.07.0440 (80-80) Pouring the first section of the concrete roof slab. This stage in construction is marked by the erection of a flowery cross. 15 Mar 1956 1997.07.0441 (80-81) The erection of the cross as usual tradition in building operations in Greece, marks the start of the roofing. Pouring the first section of the concrete roof slab. General view showing the whole facade. 15 Mar 1956 2012.54.0986 (LXXIV-2) Ionic columns and shop doors. 10 Feb 1955 2012.54.1494 (LXXIX-7) Fluting the first Doric column. 14 Jul 1955 2012.55.0110 (80-22) The first double Ionic column and the first parapet block in place. 3 Jan 1956 2012.55.0128 (80-40) Setting the first block of the upper cornice on the facade. 16 Feb 1956 2012.55.0167 (80-79) The erection of the cross as usual tradition in building operations in Greece, marks the start of the roofing. 15 Mar 1956