| 2019.20.0100 (2019-03-22) | Trench at end of season, bedrock cutting of koukla deposit and House N in foreground. | 30 Jul 2019 | | |
| 2019.20.0101 (2019-03-23) | Bedrock cutting of koukla deposit, with higher elevation to north. | 30 Jul 2019 | | |
| 2019.20.0102 (2019-03-24) | Bedrock cutting of koukla deposit, northern end, with dividing wall of House N and House O. | 30 Jul 2019 | | |
| 2019.20.0103 (2019-03-25) | Bedrock cutting of koukla deposit, northern end, Post-Sullan drain in foreground. | 30 Jul 2019 | | |
| 2019.20.0063 (2019-04-09) | End of season, koula deposit cutting in foreground, looking towards House L floor (covered). | 30 Jul 2019 | | |
| 2019.20.0064 (2019-04-10) | End of season, koula deposit cutting in foreground, looking towards House L floor (covered). (same as 2019-04-09) | 30 Jul 2019 | | |
| 2019.20.0071 (2019-05-05) | End of season, House K floor in foreground looking towards House N and koukla deposit cutting. | 30 Jul 2019 | | |
| 2019.20.0072 (2019-05-06) | End of season, House K floor in foreground looking towards House N and koukla deposit cutting. (same as 2019-05-05) | 30 Jul 2019 | | |