| 2012.80.0866 (94-25-10) | Well K 1:2 with road surface to north, after removal of Layer XI. Note that the next surface is cut through for raising of well head. | 6 Jul 1994 | | |
| 2012.80.0867 (94-25-11) | Well K 1:2 with road surface, from north-northeast. | 6 Jul 1994 | | |
| 2012.80.0911 (94-26-20) | Road surface southeast of Well K 1:2, from south. Note rock fall at center, and line of wall appearing at right, just below scarp. | July 1994 | | |
| 2012.80.0912 (94-26-21) | To left, road surface southeast of Well K 1:2, from north. Frankish Pit at left, Pithos 10 behind well, and rock fall center/rear. | July 1994 | | |
| 2012.80.1608 (94-47-24) | Destruction debris north-northwest of Well K 1:2. From northwest, partially exposed. | August 1994 | | |
| 2012.80.1609 (94-47-25) | Destruction debris north-northwest of Well K 1:2, from west. | August 1994 | | |
| 2012.80.1630 (94-48-11) | Destruction debris north and northwest of Well K 1:2, note platform north of well. From west. | 8 Aug 1994 | | |
| 2012.80.1640 (94-48-21) | Destruction debris to north of Well K 1:2, with baulk removed. From north. Note platform. | 9 Aug 1994 | | |
| 2012.80.1642 (94-48-23) | Destruction debris to north of Well K 1:2, with baulk removed. | 9 Aug 1994 | | |
| 2012.81.0744 (95-26-18) | Platform of Well K 1:2 after dismantling upper well heads. Note destruction debris at upper and lower right. From west-southwest. | 20 Jun 1995 | | |
| 2012.81.1028 (95-36-3) | Eastern half of trench from west. Platform of Well K 1:2 at center. Note bowl at center right, lime slaking pit in rear (A). Ox-head pit at right. | 5 Jul 1995 | | |
| 2012.81.1132 (95-38-33) | Well K 1:2 with bowl to south. From east. | 17 Jul 1995 | | |
| 2012.81.1133 (95-38-34) | Well K 1:2 with bowl to south. From east and above, showing tile paving to south (left). | 17 Jul 1995 | | |
| 2012.81.1134 (95-38-35) | Well K 1:2 with bowl to south. From north. | 17 Jul 1995 | | |
| 2012.81.1135 (95-38-36) | Well K 1:2 with bowl to south. From west. | 17 Jul 1995 | | |
| 2012.60.0045 (95-47-1) | Well K 1:2 with platform at 53.70m. Note drain east of platform and bowl to south. | | | |
| 2012.60.0046 (95-47-2) | Well K 1:2 with platform at 53.70m. Note drain east of platform and bowl to south. | | | |
| 2012.60.0047 (95-47-3) | Well K 1:2 with platform at 53.70m. Note drain east of platform and bowl to south. | | | |
| 2012.60.0051 (95-47-7) | Well K 1:2 with platform at 53.70m. | August 1995 | | |
| 2012.60.0052 (95-47-8) | Well K 1:2 with platform at 53.70m. | August 1995 | | |