[Corinth Report] Northeast of Theater 2022, Trench 19B, by O’Connor, Kelly E. and Uritis, Catherine A. (2022-05-09 to 2022-05-27): NET Trench 19B, Session II Final Report

Kelly E. O’Connor and Catherine A. Uritis Corinth 2022 Session II (5/9/22- 5/27/22) 27 May 2022 Northeast of Theater, Trench 19B, Session II Final Report Elevations of Identified Road Levels in 19B South ... Northeast of Theater 2022, Trench 19B, by O’Connor, Kelly E. and Uritis,

[Corinth Report] New Apotheke: D. Kokolopoulos and E. Lambraki Field 2016 by (2016-05-30 to 2016-08-13): Final Report on the Excavations for the ASCSA’s New Apotheke

This excavation was undertaken from May 30-August 13, 2016 in the area of the planned new apotheke of the ASCSA’s Corinth Excavations. As the excavation permit requires, the primary objective was to reach ... 1-6, 8, and 17, as well as ... 6, 8); the same period ... bulldozer trench 8), and Wall