EXCAVATION SUMMARY
Six weeks ago, on April 10, 2007, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an excavation area at the extreme north of the Nezi field under the supervision of Guy Sanders, ... Nezi Field, context 2 |
Luke Madson and Jesse James, Session III 2022 (May 30 - June 24)
Excavation Summary:
This excavation took place from May 30 to June 17, 2022, during the third excavation session of the season. It continued ... (ca. 0.2m tall), possibly ... by 0.8m E-W (visible ... from the E (at 36.95m in the |
Danielle Smotherman
Temple E, Southeast Excavations
Session I
Unit 2, Room 2
N: 1066.50 N, S: 1065.00 N, E: 119.27 E, W: 116.57 E
Unit 2, Room 9
N: 1086.73, S; 1079.10 N, E: 132.85 E, W: 126.83 E
21-28 ... Corinthia | Ancient Corinth | Central Area | Temple E, Temenos | Temple E |
INTRODUCTION
In the past three weeks, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an area at the extreme north of the Nezi field under the supervision of Director of Excavation Guy Sanders ... was excavated with B2=B ... square meters located 263 E to 279 E and 1002 N to 1008 N |
The room bounded by wall 366 and robbing trench 497 to the north (1006.00 N), wall 365 to the south (1002.10 N), and walls 332 to the east (262.07 E) and wall 306 to the west (258.01 E) was excavated between ... 259.79E to 261.38 E. Four ... 83.90 m. It appeared to ... the east (262.07 E) and |
Sarah Rous, Rebecca Worsham
Session I
Temple E Southeast Excavations
N: 1087 N, S: 1075.25 N, E: 129 E, W: 116.5 E
6–25 April 2014
Introduction
This is the final summary of the first session of excavation ... at 117.5 E.
Excavation in ... at 121.00 E.
We did not ... beneath NB 864 B62 on the E |
Alison Fields and Jessica Lamont
Team White, Session 3
Nezi Field Excavations Interim Report
Area 1: N-S 1016.05-1011.70, E-W 274.18-278.91
Area 2: N-S 1009.51-1005.94, E-W 278.90-271.47
May 27-June 14 ... at H 86.28 m. in ... began at H 87.21 m. in ... 1.34 m. D, the fill of this |
Kelly E. O’Connor and Catherine A. Uritis
Corinth 2022 Session II (5/9/22- 5/27/22)
27 May 2022
Northeast of Theater, Trench 19B, Session II Final Report
Elevations of Identified Road Levels in 19B South ... Kelly E. O’Connor and ... (wheelbarrow and sieve), Kelly E. ... E. The first extension is |
|
|