[Corinth Report] South Stoa 2016 by Alexandra Daly and Thalia Parr (2016-05-04 to 2016-05-20): Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016

Final Report: Excavations of South Stoa, Shop 1 Rear, Session 2 2016 Alexandra Daly and Thalia Parr DATES OF EXCAVATION: May 4-20 2016 COORDINATES: N: N 1090.40; E: E 353.95; S: N 1084.70; W: E 349.60 ... South Stoa 2016 by Alexandra Daly and Thalia Parr (2016-05-04 to 2016-05-20)

icon

[Agora Report] 2006 Excavations: Preliminary Report on the 2006 Excavation Season

John McK. Camp II ... This summer the 75th anniversary of the beginning of the excavations and the 50th anniversary of the reconstruction of the Stoa of Attalos were celebrated. Excavation were concentrated on two areas: northwest ... 13 Jun-4 Aug 2006 ... John McK. Camp II

[Corinth Report] Temple E, Southeast 2014 by Stephanie Kimmey and Jennifer LaFleur (2014-04-07 to 2014-04-28): Final Summary, Session I (NW Passage)

Stephanie Kimmey and Jennifer LaFleur Session 1 TESE Excavations, NW Passage N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E April 7-May 3, 2014 This is the final summary of excavation ... Frankish coin of Guy I or II de ... coarse ware basin (C 2014-4 ... 83G; B. 81, NB 839, p. 139);

[Corinth Report] Temple E, Southeast 2015 by Rodríguez-Álvarez, Emilio, Lorenzová, Alžběta with additions from Larkin Kennedy (2015-04-21 to 2015-04-28): Final Report Unit 2, Rooms 4 and 6. Session I 2015

Introduction: This is the final report for the first session of excavations in the 2015 season for Rooms 4 and 6 of Unit II in the area of Temple E SE. Room 4 was last excavated by A. Rohn in July and ... Rooms 4 and 6 of Unit II in ... from the west wall and 2.20 ... Room 4 was last excavated by

[Corinth Report] Nezi Field 2009 by Martin Wells, Katie Rask (2009-06-17 to 2009-06-18): 2009 Excavation summary

Katie Rask, Marty Wells ASCSA Corinth Excavations End of Season Report Blue Team North of Nezi The following is a summary of the excavations carried out in the area north of Nezi field during the 2009 ... addition (E: 285.4 – 286.65; N: ... B of this report. More ... however, after approximately 2