|
Kyle Mahoney and Rachel McCleery
Nezi Field Excavations Final Report
1015.20 to 1005.80 N, 264.30 to 277 E
May 28-June 15, 2012
This is the final report on the third session of excavation (May 28-June ... between 269.80 and 270.40 E.
A ... 270.20 E. The floor was ... in the red layer. As G. |
Andrew Connor, Simon Oswald
Team Pink
Final Report for April, 2012
Session 1, 2012 American School Corinth Excavations
Nezi Field, NE Region. N 1013-1014 S 1007.5-1009.5 E 276.0 W 264.5
This report ... the west by N-S wall 540 (E ... NE Region. N 1013-1014 S 1007.5-1009.5 E 276.0 W 264.5 |
Jonida Martini, Larkin Kennedy, and Rachel McCleery
Team Pink Report for May, 2012 season
Session 2, 2012 American School Corinth Excavations (April 30-May 19, 2012 for final report)
Nezi Field, NE Region ... fit with G. Sanders’ ... Field, NE Region
E 264 to 275, ... region, to the east of N-S wall |
|
|