[Corinth Report] Temple E, Southeast 2014 by Bram ten Berge and Katerina Ragkou (2014-05-05 to 2014-05-26): Roads and Courtyard of NW Passage, Session 2

Bram ten Berge, Katerina Ragkou Session II Temple E Southeast Excavations (TESE) N: 1071.69 S: 1058.97 E: 103.11 W: 94.50 May 5, 2014 – May 26, 2014 Introduction This is the final summary of the ... chamber are 1.76 m (l.) x 1.55 ... 0.20-0.35 (l.) x 0.20-0.30 (h.)), ... 0.10 (l.) x 0.10 (h.), and

[Corinth Report] Temple E, Southeast 2014 by Ross Brendle and Justin Holcomb (2014-06-02 to 2014-06-27): Room F/5 and South Hall in Unit 2, Session 3

Session III Temple E Southeast 2-27 June 2014 This is the final summary of the third and final session of excavations for the 2014 season in the north area of Unit 2 in the Frankish quarter, Temple E ... limestone blocks (0.35 x 0.20 x ... construction, 1.10 x 0.50 x 0.18 m, ... was similar, 0.43 x 0.70 x

[Corinth Report] Temple E, Southeast 2015 by Wesley Bennett, Lucas Stephens (2015-05-04 to 2015-05-22): 2015 Session II, Corridor N of Church and Room 6

Wesley Bennett and Lucas Stephens Session II Temple E Southeast Excavations Corridor North of Church: 1075-1078.5 N, 121.5-129.5 E Room 6: 1077-1085 N, 116.85-120.7 E 04-22.05.2015 This is the summary ... and a 1 x 1 m extension was ... 5.5 x 1.2 m, 1076.6-1075.4 ... 2015-76 – context 662, 2015-77

[Corinth Report] Temple E, Southeast 2014 by Stephanie Kimmey and Jennifer LaFleur (2014-04-07 to 2014-04-28): Final Summary, Session I (NW Passage)

Stephanie Kimmey and Jennifer LaFleur Session 1 TESE Excavations, NW Passage N: 1073.00 N; S: 1058.07 N; E: 108.91 E; W: 94.00 E April 7-May 3, 2014 This is the final summary of excavation ... 65; N-S: 1070.23-1068.76 ... 0.69 x 0.31 x 0.15m ... measured 1.13 x 0.40 x 0.19m.

[Corinth Report] Nezi Field 2013 by Mohammed Bhatti and Daniel P. Diffendale (2013-05-09 to 2013-05-10): 2013 Session 1, Team Pink, Final Summary

Mohammed Bhatti and Daniel P. Diffendale Team Pink, Session 1 Nezi Field Excavations Final Report N 1006 – 1018.00; E 261.01 – 271.28 1–25 April 2013 This is a final summary of the first season of excavation ... construction measuring some 0.90 x ... 76 illegible). At some ... ca. 0.20 x 0.35 m, at the

[Corinth Report] Nezi Field 2007 by Lydia Herring, Josh Langseth, Kris Lorenzo (2007-04-09 to 2007-05-18): Frankish to Modern Strata in the Southern End of Nezi Field

EXCAVATION SUMMARY Six weeks ago, on April 10, 2007, we, Lydia Herring, Josh Langseth, and Kris Lorenzo, opened an excavation area at the extreme north of the Nezi field under the supervision of Guy Sanders, ... Nezi Field, context 76