Luke Madson and Jesse James, Session III 2022 (May 30 - June 24)
Excavation Summary:
This excavation took place from May 30 to June 17, 2022, during the third excavation session of the season. It continued ... (C-2022-7 and C-2022-20) appear ... of C-2022-20)
Water Pipe ... and Water Pipe 3, running |
Excavation Summary
During the third training session of the 2007 season, we, J. Matthew Harrington and Theodora Kopestonsky, conducted excavations in the area north of the Nezi field for a total of fourteen ... Nezi Field 2007 by J. Matthew Harrington and Theodora Kopestonsky (2007-05-21 to |
This excavation was undertaken from May 30-August 13, 2016 in the area of the planned new apotheke of the ASCSA’s Corinth Excavations. As the excavation permit requires, the primary objective was to reach ... New Apotheke: D. Kokolopoulos and E. Lambraki Field 2016 by (2016-05-30 to |
Katie Rask, Marty Wells
ASCSA Corinth Excavations
End of Season Report
Blue Team
North of Nezi
The following is a summary of the excavations carried out in the area north of Nezi field during the 2009 ... with 7mm screens and 3 ... characterized by soil with a high ... century activity is marked by a |
We, Nathan Arrington (NTA) and Drew Sweet (AWS), excavated North of Nezi between April 8, 2008 and April 22, 2008, focusing on the eastern area, in Room E, a “corridor” north of Room E, and a room north ... Nezi Field 2008 by Nathan T. Arrington and Andrew (Drew) W. Sweet (2008-04-07 to |
Kate Larson and Jon Meyer
ASCSA Corinth Excavations
Blue Team Session 3 Final Report
N :1016.50 N, E: 263.00 E, S: 1005.70 N, W: 255.50 E
May 27 – June 18, 2013
During Session 3 2013, the Blue Team excavated ... destroyed by the 2nd or 3 ... dated by a large piece of ... It was supported by a 0.25 |
|
|